Kaifeng City

2023 Road sponge transformation project Binhe Road (Yangshiqiao - Chemical Road) pump station connected pipe network and road sponge transformation project calibration extension announcement

Release time: 2024-03-08 12:14:58 Number of page views: Author: Kaifeng Public resources trading information Network

          Our work2023 Road sponge transformation project Binhe Road (Yangshiqiao - Chemical Road) pump station connected pipe network and road sponge transformation project招标Stipulated in the documentThe bid inviter shall receive the evaluation reportCalibration will be completed within 10 days,Due to the long time required to handle the relevant procedures of the bid evaluation, the bid evaluation activities cannot be held on timeTherefore, the calibration time is postponed toBidding will be conducted in Kaifeng Public Resources Trading Center at 15:00 on March 12, 2024. Each candidate can go to the hall on the fifth floor of the Citizen's Home to watch the bidding meeting in real time through the electronic large screen. Those who do not attend the site will be regarded as the default of the bidding result of the project and have no objections

 

 

 Kaifeng City Administration Bureau (Kaifeng City Comprehensive Law Enforcement Bureau)

202438


Download attachment:eb8d6d222ed17668e5ce7aa7973e87d.jpg

All rights reserved:Kaifeng city public resources trading information networkHost: Kaifeng public resources trading information network
Address: Kaifeng City citizens home 5th floor 邮编:475000 Email: kfggzyjyzx2018@163.com Website record number:Yu ICP prepared No. 12001764-1

Technical support:Zhengzhou Xinyuan Information Technology Co., LTD